Nickel Tank Initial Brightener can be used on new nickel solutions made up from base salts.
If you are converting an existing nickel bath to our brightener system, you will need to carbon treat the bath to remove the original brightener system before adding ours.
Please note that our Nickel Tank Plating Solution comes with this Initial Brightener already added and is therefore ready-to-use.
Please read the Tech Specs tab for further information.
HS Code: 3824 99 70
Nickel Tank Plating Initial Brightener can be added to most baths made up from base salts to produce a bright nickel plating bath.
Once added, the solution is ready for use but will require the use of Nickel Maintenance Brightener in order to maintain brightness.
Please note that if you’re converting from an existing bright nickel plating operation, all of the original brightening components
will have to be removed first.
Operating conditions
Concentration for new bath
20ml/litre (see notes)
Ongoing addition rate
Not required
Special storage requirements
None
Shelf life
Over 2 years
Health and Safety classification
Irritant
Special considerations
N/A
Transport (UN number)
None: Not classified as dangerous for transport
Notes:
Once the required addition of Initial Brightener is added, the solution is ready for use
and no further additions will be necessary.
General guide;
Certain small items, for example Swabs, Nibs and Plating Pens can be sent by normal post within the UK
The courier option for UK deliveries is FedEx
Free UK mainland delivery available on orders over £200
International orders usually 3-5 working days.
For all price quotations for deliveries, please add your items to our shopping cart. You will be able to see the shipping costs by clicking on the ‘Calculate shipping’ button in the cart and before checking out.
You can access our MSDS by scanning the QR code which is on our product bottles.
Here is a video to show you how;